













| P583(CP4E)-T1A CLP Tx Room & LV switchroom | Airport Authority | 
| SCL 1111 – Hung Hom North Approach Tunnels – WSD working platform for DAV of watermain at Pipe Bridge of OB2 | Gammon Construction Limited | 
| DC/2013/10 Design, Build and Operate San Wai Sewage Treatment Works – Phase 1 | ATAL CONSTRUCTION LIMITED | 
| Main Contract (Phase 2A works) – Proposed Chu Kong New Terminal Facilities, Tuen Mun Town Lot No.491, New Territory | Concentric construction Ltd | 
| CV/2016/08 Queen’s Hill Development – Sewage Pumping Station Works | China Geo-Engineering Corporation | 
| HY/2014/08 Central Kowloon Route Yau Ma Tei East | BK-SK-JV | 
| Proposed Residential Developement at Inland Lot No. 8949 – 21,23&25 BORRETT ROAD, H K | CR Construction Company Limited | 
| WO NO: B7935329 Replace granite slab covers with as tray at Ngau Chi Wan Park, middle and lower platform | 建築署(ASD) | 
| Liantang Port Cross – Border | LEIGHTON CONTRACTORS (ASIA) LIMITED | 
| HY/2011/08 Construction of tunnel buildings, installation of route-wide electrical and mechanical works and TCSS, and associated works for tunnel commissioning. | Leighton Joint Venture |